The Celta 2 and Celta 3 photovoltaic plants in Aragón are designed to supply large scale renewable electricity through modern bifacial technology and single axis tracking, ensuring efficient production under the region’s strong solar conditions. Both projects aim to deliver reliable grid compliant generation by integrating dedicated 30/132 kV transformation and extensive HV evacuation routes, while adapting their layouts to local topography, hydrology, and environmental requirements.
Their development demands precise coordination of permitting, land securement, equipment procurement, and construction progress across two adjacent sites and shared transmission infrastructure. With careful attention to regulatory milestones, grid integration criteria, and long-term operational reliability, the projects are structured to achieve stable commercial operation.
To support these objectives, Fichtner, acting on behalf of the Japanese co‑investor Daiwa Energy & Infrastructure, carried out a comprehensive technical due diligence study covering design, permitting, construction status, contracts, and energy yield expectations.
Project Factsheet
Celta 2 peak power
Celta 3 peak power
Key Facts
Client
Daiwa Energy and Infrastructure Co. Ltd.
Tokyo
Japan
