Skip to main contentSkip to page footer

Rooftop Photovoltaic Projects Sagunto 1 & Sagunto 2

Spain

Project Factsheet

The rooftop photovoltaic projects in Sagunto form part of a broader program to implement self-consumption solar installations designed to deliver on-site renewable energy and long-term sustainability benefits. The systems comprise rooftop-mounted substructures, photovoltaic modules, DC cabling using a harness solution, AC cabling, and coordinated integration of medium and low-voltage equipment. Construction progress follows a structured approach that includes managing minor delays, optimizing installation logistics, and maintaining strict quality assurance, from equipment verification and storage conditions to panel assembly and electrical connection readiness. The projects also feature careful coordination of cable routing, inverter installation, and performance-relevant details such as dust management on panels and switchboard protection. Within this framework, Fichtner acts as Purchaser’s Representative, conducting design reviews, monitoring construction, verifying milestones, and preparing acceptance assessments for the installations.

Installed capacity
PV projects
Key Facts

Engineering Rooftop Photovoltaic Systems in Sagunto

  • Review of planning, materials, and design documentation 
  • Review of structural and yield calculations 
  • Attendance at progress and coordination meetings
  • Site visits at construction milestones 
  • Verification of milestone evidence and payment approval 
  • Provisional acceptance inspection and punch list 
  • Review of as‑built documentation and guarantees 
  • Final acceptance inspection and reporting
  • Installed capacity: 3,730 MWp 
  • Total rooftop systems: 150
  • Portfolio target: 20 PV projects

Client

GLP Spain Onsite Renewables S.L.U.

Madrid
Spain