Mata de Palma II & III: Enabling Grid Ready Renewable Power

Dominican Republic

Project Factsheet

The Mata de Palma II and III solar projects were developed to significantly expand renewable power generation in the Dominican Republic by adding two 50 MW photovoltaic plants equipped with high efficiency monocrystalline modules and modern string inverters. Their design follows a clear objective: to maximize energy production through optimized layouts, fixed tilt structures and reduced cabling losses, while ensuring reliable long term operation under local site conditions. A key technical challenge was the limited capacity of the Guerra substation, which made it necessary to construct a new high voltage transmission line and the intermediate Mirasol substation to enable proper energy evacuation into the national grid. The projects also include a dedicated 34.5/138 kV step up substation to feed power into the SENI network. In this context, Fichtner performed the technical audit of the design and monitored the progress of construction.

total nominal power
grid connection
HV towers
Key Facts

Delivering New Solar Capacity for the Dominican Grid

  • Technical due diligence of design
  • Construction progress monitoring
  • Review of documentation
  • Site visit assessments
  • Verification of testing procedures
  • Evaluation of commissioning status
  • Compliance verification with project specifications
  • Reporting to project stakeholders
  • Plant II peak power: 67.0 MWp 
  • Plant III peak power: 73.2 MWp 
  • Nominal power (each plant): 50 MWac 
  • PV modules: 650–660 W monocrystalline 
  • Inverters: 215 kW string inverters 
  • DC voltage level: ≈1200 VDC 
  • AC output voltage: 800 VAC
  • Transmission line towers: 94 HV towers
  • Voltage step‑up: 34.5 kV to 138 kV

Client

Dominion Global

Bilbao
Spain