Mallorca Waste Treatment Center was developed to manage the island’s separately collected waste streams through an integrated network of specialized treatment facilities. Its objectives include maximizing material recovery, producing high-quality organic fertilizer, and ensuring environmentally sound processing of packaging waste, organic fractions, and incineration slag. The center combines automated sorting technologies, advanced anaerobic digestion, multistage composting systems, and slag conditioning processes to create valuable outputs such as recyclable materials, biogas for power generation, and construction-grade aggregates. Common infrastructure links these plants into one integrated compound designed to support modern, efficient, and sustainable waste management on the Balearic Islands. To realize this, Fichtner provided comprehensive engineering, design, and supervision services throughout all project stages.
Project Factsheet
Total treatment capacity
Overall composting capacity
Anaerobic digestion capacity
Key Facts
Client
TIRME S.A.
Palma de Mallorca
Spain
