Skip to main contentSkip to page footer

Mallorca Waste Treatment Center

Spain

Project Factsheet

Mallorca Waste Treatment Center was developed to manage the island’s separately collected waste streams through an integrated network of specialized treatment facilities. Its objectives include maximizing material recovery, producing high-quality organic fertilizer, and ensuring environmentally sound processing of packaging waste, organic fractions, and incineration slag. The center combines automated sorting technologies, advanced anaerobic digestion, multistage composting systems, and slag conditioning processes to create valuable outputs such as recyclable materials, biogas for power generation, and construction-grade aggregates. Common infrastructure links these plants into one integrated compound designed to support modern, efficient, and sustainable waste management on the Balearic Islands. To realize this, Fichtner provided comprehensive engineering, design, and supervision services throughout all project stages. 

Total treatment capacity
Overall composting capacity
Anaerobic digestion capacity
Key Facts

Engineering Support for Mallorca Waste Treatment Center

  • Basic engineering 
  • Construction design preparation 
  • Equipment purchase specifications 
  • Bid evaluation 
  • Technical assistance for contracts 
  • Interface detail engineering 
  • Construction supervision 
  • Commissioning and trial run supervision
  • Light packaging sorting capacity: 17,000 t/a 
  • Anaerobic digestion capacity: 32,000 t/a; power generation: 1 MWe 
  • Composting capacity (total): 98,180 t/a 
  • Slag treatment capacity: 82,500 t/a 
  • Total area of all facilities combined: 88,510 m² 

Client

TIRME S.A.

Palma de Mallorca
Spain