The Can Barba anaerobic digestion and composting plant in Terrassa plays a key role in treating municipal organic waste fraction (biowaste) from the Vallès Occidental district. As selective collection increases and high-efficiency models such as door-to-door systems are progressively introduced, the region’s growing biowaste volumes require a significant expansion of processing capacity. The project therefore aims to increase the plant’s throughput to 60,000 t/a while enhancing operational performance. Key objectives include reorganizing internal material and vehicle flows, strengthening reception autonomy, improving digestion stability, and upgrading biogas valorization through injection into the gas grid. The expansion also envisages extended support infrastructure, including new offices, a laboratory, service areas, visitor center, and a dedicated visitors’ route. To enable this transformation, Fichtner provided the basic engineering, analyzing the preliminary concept, core technical aspects, process balances, sizing, and proposed plant layout.
Project Factsheet
t/a planned treatment capacity
Nm³/a expanded biogas production
Nm³/a biomethane for grid injection
Key Facts
Client
Consorci per a la Gestió de Residus del Vallès Occidental
Barcelona
Spain
