Decarbonization Plan for an Integrated Waste Recovery Facility

Spain

Project Factsheet

The feasibility and alternatives study for the decarbonization plan of the Maresme Integral Center For Waste Recovery (CIVRM) supports the consortium’s goal of ensuring an integrated and efficient public service for municipal waste treatment across the Maresme region. As the owner of the CIVRM, where heterogeneous mixed waste and other fractions are managed, the consortium aims to advance circular economy principles and strengthen the environmental and socio economic performance of its infrastructures. The project examines solution options for reducing emissions at the CIVRM, carried out over eight months in two phases: an initial preliminary analysis of all proposed solutions and a subsequent phase defining the selected options at preliminary design level. Between these phases, the consortium and the waste authority of Catalonia (Agència de Residus de Catalunya) jointly assessed which alternatives to pursue. Fichtner delivered the complete feasibility and alternatives study.

t/a RESTA plant capacity
t/a energy recovery plant capacity
Key Facts

Advancing Circular Waste Valorization in the Maresme Region

  • Feasibility study preparation
  • Alternatives assessment
  • Two‑phase project structure development
  • Preliminary analysis of proposed solutions
  • Preliminary design definition
  • Technical evaluation support
  • Process coordination support
  • Structured decision‑making facilitation
  • Built area: 30,000 m²
  • Installed power: 8,600 kW
  • Mixed waste plant capacity: 190,000 t/a
  • Energy recovery plant capacity: 140,000 t/a
  • Number of lines: 2

Client

Consorci per al Tractament de Residus Sòlids Urbans del Maresme

Barcelona
Spain