The conversion of Ecoparc 3 in Sant Adrià de Besòs represents a major step in modernizing Barcelona’s metropolitan waste management infrastructure and aligning it with the PREMET25 strategy for sustainable resource and waste treatment. The project aims to transform the existing mechanical and biological treatment (MBT) facility into a plant capable of efficiently processing both the organic fraction of municipal waste (biowaste) and residual waste at nominal capacities of 50,000 t/a and 192,000 t/a respectively. This requires extensive civil works, the installation of new dry and wet pretreatment lines for FORM, and comprehensive modifications to anaerobic digesters, air handling systems, and water treatment facilities. A key feature of the project is its integration of advanced biological processes with improved environmental performance and operational resilience. Fichtner supported this ambitious transformation by, in the first stage, assisting the Greater Barcelona Waste Authority in defining the necessary modifications and, in the second stage, providing technical assistance throughout the engineering, procurement, and construction phases.
Project Factsheet
t/a FORM treatment capacity
t/a RESTA treatment capacity
Key Facts
Client
In the first stage: Área Metropolitana de Barcelona (AMB)
Barcelona
Spain
In the second stage: UTE FFCMA-Griñó Form Ecoparc 3 Bcn
Barcelona
Spain