Skip to main contentSkip to page footer

The project focuses on expanding the anaerobic digestion and composting plant operated by a consortium of local councils for waste treatment in Vallès…

The Can Barba anaerobic digestion and composting plant in Terrassa plays a key role in treating municipal organic waste fraction (biowaste) from the…

The conversion of Ecoparc 3 in Sant Adrià de Besòs represents a major step in modernizing Barcelona’s metropolitan waste management infrastructure and…

The project aims to significantly improve air quality by installing a catalytic reduction system that lowers nitrogen oxides, ammonia slip, and…

Mallorca Waste Treatment Center was developed to manage the island’s separately collected waste streams through an integrated network of specialized…

Alleging that changes to Spain’s government subsidy conditions had unfairly disadvantaged him, the owner of a solar power plant initiated arbitration…

A special bank fund for solar and wind power plants in Europe aimed to align its extensive portfolio with the requirements of the EU Taxonomy. In the…

The Campdorà Waste-to-Energy project marked a major step toward sustainable energy recovery and environmental responsibility. Its primary objective…

The Celta 2 and Celta 3 photovoltaic plants in Aragón are designed to supply large scale renewable electricity through modern bifacial technology and…

Get in touch with us

Business Development Director

Susana Martínez